Universal Group were contracted by Amco to deliver the railway bank stabilisation project in Dorn, Gloucestershire.
View/DownloadWe were contracted by Murphys to construct a raised inspection apron and a driver walkway, which was 180Lm long either side of the live electrified siding line.
View/DownloadUniversal Civils were contracted by Dyer & Butler to complete all of the repairs to the brickwork and structural cracks at Willetts Lane Bridge.
View/DownloadOur civils team were contracted by J Murphy and Sons to undertake the reinforced concrete and associated works to lift pits, island platform, motor/plant room and staircase foundations as part of the Stechford Station enhancements project.
View/DownloadOur civils team were contracted by Morgan Sindall to construct 2no 16 man lifts, as part of the Meols Station project.
View/DownloadWe were contracted by Morgan Sindall to construct the new metro rail station and associated platform, as part of the South Shields Transport Interchange project.
View/DownloadWe were contracted by Dyer & Butler to undertake the construction of nine new drivers platforms required in preparation for the release of the summer timetables.
View/DownloadWe were contracted by I-Line to complete drainage works at Capital Valley, Pontypool
View/DownloadWe were contracted by AMCO to complete drainage works at Hotspur Street, Liverpool
View/DownloadWe were contracted to fix in place the formwork to a pre-formed steel 'U' deck to replace the existing Pill Underbridge.
View/DownloadWe were contracted to undertake all associated foundation works for a new residential property.
View/DownloadWe were contracted to complete the piling platforms ready for the new footbridge installation.
View/DownloadWe were contracted to install the all the associated foundations for a footbridge.
View/DownloadWe were contracted by McLaren Construction to undertake a refurbishment of the Market Place Shopping Centre in Bolton.
View/DownloadWe were contracted by AMCO to undertake the removal of the existing bridge and the construction & installation of the new bridge.
View/DownloadWe were contracted by ISG to undertake demolition works of a petrol filling station and then the construction of a Tesco express in Sheffield.
View/DownloadWe were contracted to undertake de-vegetation works and complete masonry repairs.
View/DownloadWe were contracted by AMCO to undertake deveg works and Masonry repairs to Brook bridge at Sandwell and Dudley station.
View/DownloadWe were contracted to carry out the civils element at Middleway Level Crossing.
View/DownloadWe were contracted by AMCO to undertake works associated with the Hucknall overbridge replacement scheme.
View/DownloadWe were contracted by AMCO Rail to undertake refurbishment works to an Rail Underbridge in Walsall as part of AMCO’s CP5 Framework Contract with Network Rail.
View/DownloadWe were contracted to clear site of block paving, fencing and cycle stands to allow for the jacking and demolition of existing bridge piers.
View/Download