Universal piling were contracted by Volkerfitzpatrick to install Platipus anchors and erosion matting to a cutting slope near to Farnborough station.
View/DownloadUniversal Piling were contracted by Dyer & Butler to stabilise a rail embankment following a landslip at Bough Beech, Kent.
View/DownloadUniversal Piling were contracted by Alun Griffiths to deliver the sheet piling and associated tie bars for the project at Bangor Gwynedd.
View/DownloadUniversal Piling were contracted by VolkerFitzpatrick to stabilise a failed railway embankment following a landslip in January.
View/DownloadOur piling team were contracted by Alun Griffiths to deliver the sheet piling element of their project at Waun-Gron Park Station, Cardiff.
View/DownloadOur piling team were contracted by Morgan Sindall to deliver piled foundations for a new rockfall shelter adjacent to Parsons Tunnel, Dawlish.
View/DownloadOur piling team were contracted by Alun Griffiths to form bearing piles and a contiguous wall for a new footbridge at Cwmcynon.
View/DownloadOur piling team were contracted by Pod-Trak to deliver a slope stabilisation project at Callow Hill, Chippenham.
View/DownloadOur Piling team were contracted by CML to drill and install perforated land drains on a steep sided embankment at Bath Road, Cheltenham.
View/DownloadOur Piling team were contracted by Alun Griffiths to deliver all sheet piling requirements as part of the embankment widening scheme at Pentrebach.
View/DownloadOur piling team were contracted by Octavius to deliver a soil nail and mesh solution to stabilise the embankment at Bincombe Wood, Swindon.
View/DownloadAmco contracted Universal Piling to deliver a Railway Bank Stabilisation project in Doublebois, Cornwall.
View/DownloadUniversal Group were contracted by Amco to deliver the railway bank stabilisation project in Dorn, Gloucestershire.
View/DownloadMurphys contracted us to install a cess retention scheme at Mitre Curve embankment on the Wembley main line located in Willesden, London.
View/DownloadOur piling team were contracted by Podtrack to install a 30m stretch of sheet piles and a 15m stretch of Kingpost wall.
View/DownloadWe were contracted by Murphys to construct a raised inspection apron and a driver walkway, which was 180Lm long either side of the live electrified siding line.
View/DownloadUniversal Piling were contracted by AMCO to complete a retaining wall against a railway line.
View/DownloadUniversal Piling were contracted by AMCO to stabilise 21,000 m2 of cutting, either side of a running line at Studley Grange, Swindon.
View/DownloadUniversal Piling were contracted to install 84 piles 450mm diameter ranging from 10m to 14m, forming a contiguous wall to retain the soil within the perimeter of a train maintenance shed.
View/DownloadWe were contracted to install the foundation piles for a new footbridge to replace the level crossing.
View/DownloadWe were contracted to supply the specialist piling labour, 2 Klemm rigs and the required ancillary equipment to assist with foundation installations.
View/DownloadWe were contracted to install piles for a new SER base.
View/DownloadWe were contracted to undertake all associated foundation works for a new residential property.
View/DownloadWe were contracted to install the pile foundations ready for a new bridge.
View/DownloadWe were contracted by Buckingham Group to install piles for a new footbridge.
View/DownloadWe were contracted by Morgan Sindall to create a king post wall for a new signal equipment room.
View/DownloadWe were contracted to install the concrete bases for new signs on the M62
View/DownloadWe were contracted to install the foundations either side of an existing pedestrian underpass to allow for an additional track to pass overhead.
View/DownloadWe were contracted by VolkerFitzpatrick to install the foundations for bridge abutments.
View/DownloadWe were contracted by Carey's to create the foundations using various pile widths and depths for a multi storey building.
View/DownloadWe were contracted by VolkerStevin to install a new staircase leading from the Thames Embankment to Blackfriars Bridge.
View/DownloadWe were contracted by J. Murphy & Sons Ltd to install the piles for a new footbridge railway crossing at Basford Sidings, Crewe.
View/DownloadUPAC were contracted to stabilise Ashdon Way embankment (due to land slips) and to construct a safe cess walkway.
View/DownloadWe were contracted by McLaren to install a total of 750no 16m long tension piles.
View/DownloadWe were contracted by Lend Lease to undertake the piling, ducting and foundation works to a MUGA pitch for the floodlight foundations.
View/DownloadWe were contracted by Volker Fitzpatrick to undertake temporary works to a Railway bridge over the River Lea Navigation in Tottenham.
View/DownloadWe were contracted by JP Murphy & Sons to install 120nr Anchors to strengthen an existing retaining wall as part of the Gospel Oak to Barking Track Lowering Scheme.
View/DownloadWe were contracted by Osborne to stabilise the ground in 7 of their 10 stations.
View/DownloadWe were contracted by Amco to install a 34 linear metre sheet pile retaining wall for a bridge replacement in Tollerton, North Yorkshire.
View/Download