Universal Piling & Geotechnical were appointed by project partners AmcoGiffen to undertake specialist drilling and installation works at Penmaenrhos Tunnel as part of essential stabilisation and safety improvement works along this key section of the North Wales rail network.
View/DownloadUniversal Piling & Geotechnical Division was engaged by MGroup to assist in completing a partially finished slope stabilisation project. The initial phase of the works, including the installation of lower rows of soil nails, had been undertaken by an contractor using a Road Rail Vehicle (RRV) from track level. However, the remaining upper rows of nails were inaccessible from that position, leaving the project incomplete.
View/DownloadUniversal Group were contracted by VolkerWessels Specialist Business to deliver essential works that will safeguard the railway and nearby communities from landslides.
View/DownloadUniversal Group were contracted by VolkerFitzpatrick as part of the SRE framework to install soil nails and netting at a landslide stabilisation project in Honiton.
View/DownloadUniversal Group were contracted by Dyer & Butler to install sheet piles, soil nails, mesh and cess retention at a failing embankment in Clandon.
View/DownloadUniversal piling were contracted by Volkerfitzpatrick to install Platipus anchors and erosion matting to a cutting slope near to Farnborough station.
View/DownloadUniversal Piling were contracted by Dyer & Butler to stabilise a rail embankment following a landslip at Bough Beech, Kent.
View/DownloadUniversal Piling were contracted by Alun Griffiths to deliver the sheet piling and associated tie bars for the project at Bangor Gwynedd.
View/DownloadUniversal Piling were contracted by VolkerFitzpatrick to stabilise a failed railway embankment following a landslip in January.
View/DownloadOur piling team were contracted by Alun Griffiths to deliver the sheet piling element of their project at Waun-Gron Park Station, Cardiff.
View/DownloadOur piling team were contracted by Morgan Sindall to deliver piled foundations for a new rockfall shelter adjacent to Parsons Tunnel, Dawlish.
View/DownloadOur piling team were contracted by Alun Griffiths to form bearing piles and a contiguous wall for a new footbridge at Cwmcynon.
View/DownloadOur piling team were contracted by Pod-Trak to deliver a slope stabilisation project at Callow Hill, Chippenham.
View/DownloadOur Piling team were contracted by CML to drill and install perforated land drains on a steep sided embankment at Bath Road, Cheltenham.
View/DownloadOur Piling team were contracted by Alun Griffiths to deliver all sheet piling requirements as part of the embankment widening scheme at Pentrebach.
View/DownloadOur piling team were contracted by Octavius to deliver a soil nail and mesh solution to stabilise the embankment at Bincombe Wood, Swindon.
View/DownloadAmco contracted Universal Piling to deliver a Railway Bank Stabilisation project in Doublebois, Cornwall.
View/DownloadUniversal Group were contracted by Amco to deliver the railway bank stabilisation project in Dorn, Gloucestershire.
View/DownloadMurphys contracted us to install a cess retention scheme at Mitre Curve embankment on the Wembley main line located in Willesden, London.
View/DownloadOur piling team were contracted by Podtrack to install a 30m stretch of sheet piles and a 15m stretch of Kingpost wall.
View/DownloadWe were contracted by Murphys to construct a raised inspection apron and a driver walkway, which was 180Lm long either side of the live electrified siding line.
View/DownloadUniversal Piling were contracted by AMCO to complete a retaining wall against a railway line.
View/DownloadUniversal Piling were contracted by AMCO to stabilise 21,000 m2 of cutting, either side of a running line at Studley Grange, Swindon.
View/DownloadUniversal Piling were contracted to install 84 piles 450mm diameter ranging from 10m to 14m, forming a contiguous wall to retain the soil within the perimeter of a train maintenance shed.
View/DownloadWe were contracted to install the foundation piles for a new footbridge to replace the level crossing.
View/DownloadWe were contracted to supply the specialist piling labour, 2 Klemm rigs and the required ancillary equipment to assist with foundation installations.
View/DownloadWe were contracted to install piles for a new SER base.
View/DownloadWe were contracted to undertake all associated foundation works for a new residential property.
View/DownloadWe were contracted to install the pile foundations ready for a new bridge.
View/DownloadWe were contracted by Buckingham Group to install piles for a new footbridge.
View/DownloadWe were contracted by Morgan Sindall to create a king post wall for a new signal equipment room.
View/DownloadWe were contracted to install the concrete bases for new signs on the M62
View/DownloadWe were contracted to install the foundations either side of an existing pedestrian underpass to allow for an additional track to pass overhead.
View/DownloadWe were contracted by VolkerFitzpatrick to install the foundations for bridge abutments.
View/DownloadWe were contracted by Carey's to create the foundations using various pile widths and depths for a multi storey building.
View/DownloadWe were contracted by VolkerStevin to install a new staircase leading from the Thames Embankment to Blackfriars Bridge.
View/DownloadWe were contracted by J. Murphy & Sons Ltd to install the piles for a new footbridge railway crossing at Basford Sidings, Crewe.
View/DownloadUPAC were contracted to stabilise Ashdon Way embankment (due to land slips) and to construct a safe cess walkway.
View/DownloadWe were contracted by McLaren to install a total of 750no 16m long tension piles.
View/DownloadWe were contracted by Lend Lease to undertake the piling, ducting and foundation works to a MUGA pitch for the floodlight foundations.
View/DownloadWe were contracted by Volker Fitzpatrick to undertake temporary works to a Railway bridge over the River Lea Navigation in Tottenham.
View/DownloadWe were contracted by JP Murphy & Sons to install 120nr Anchors to strengthen an existing retaining wall as part of the Gospel Oak to Barking Track Lowering Scheme.
View/DownloadWe were contracted by Osborne to stabilise the ground in 7 of their 10 stations.
View/DownloadWe were contracted by Amco to install a 34 linear metre sheet pile retaining wall for a bridge replacement in Tollerton, North Yorkshire.
View/Download